Planning and Scheduling for Construction

Construction planning is the sequence of access, structure, envelope, fit-out and commissioning. Get the interfaces wrong and every trade looks busy while the building finishes late.

Construction

A building schedule is a sequence of access, not a list of trades

Construction programmes slip when the schedule is a catalogue of packages instead of a sequence of areas. Structure, façade, drylining, services and finishes have to follow the way the site actually releases floors, zones and risers.

We build that logic with the planner and the construction manager: temporary works, craneage, deliveries, inspections and sectional completion included. Design information is linked where late drawings are a real predecessor, not a slogan.

Firms that build for a living can also read the construction-companies pages, which split the same discipline by main contractor, subcontractor, developer and trade specialist.

On the programme

What has to be got right

Area by area

Zones, levels and risers are the backbone. Trades hang off that access sequence.

Sectional completion

Partial handovers need their own commissioning and snagging paths, or the first area steals resources from the rest.

Temporary works and logistics

Cranes, hoists and road closures are constraints with dates. Leaving them out makes the programme look shorter than the site.

How we help

How EVM Solutions supports the team

Planning, scheduling and project controls from a Manchester-based consultancy, deployed to the programme rather than tied to a local office in every city.

Trade-level logic

A baseline the package managers can update without breaking the critical path.

Look-aheads

Short-term plans that still trace back to the master schedule.

Change impact

A clear view of what a late design release or a variation does to handover.

FAQ

Questions we are often asked

Is this the same as the construction-companies section?

No. This page is about construction as a sector. The other section is about the type of company buying the planning service.

Do you plan fit-out as well as shell and core?

Yes. Shell, core and fit-out can sit in one schedule, with sectional completion between them.

Which software do you prefer on building jobs?

Primavera P6 for the integrated schedule. Short-term plans can live alongside it if the link back to the master is kept.