Zones, levels and risers are the backbone. Trades hang off that access sequence.
CONSTRUCTION
Construction planning is the sequence of access, structure, envelope, fit-out and commissioning. Get the interfaces wrong and every trade looks busy while the building finishes late.
Construction
Construction programmes slip when the schedule is a catalogue of packages instead of a sequence of areas. Structure, façade, drylining, services and finishes have to follow the way the site actually releases floors, zones and risers.
We build that logic with the planner and the construction manager: temporary works, craneage, deliveries, inspections and sectional completion included. Design information is linked where late drawings are a real predecessor, not a slogan.
Firms that build for a living can also read the construction-companies pages, which split the same discipline by main contractor, subcontractor, developer and trade specialist.
On the programme
Zones, levels and risers are the backbone. Trades hang off that access sequence.
Partial handovers need their own commissioning and snagging paths, or the first area steals resources from the rest.
Cranes, hoists and road closures are constraints with dates. Leaving them out makes the programme look shorter than the site.
How we help
Planning, scheduling and project controls from a Manchester-based consultancy, deployed to the programme rather than tied to a local office in every city.
A baseline the package managers can update without breaking the critical path.
Short-term plans that still trace back to the master schedule.
A clear view of what a late design release or a variation does to handover.
Also in this section
Rail, road, water and utilities, where possessions, third parties and linear access drive the dates.
Read the pageShell, long-lead electrical plant, MEP and phased commissioning for halls that must energise on a promised date.
Read the pagePower, renewables, networks and utilities, planned around outages, commissioning and regulatory dates.
Read the pageBrownfield shutdowns, long-lead equipment and commissioning on programmes where the asset stays live.
Read the pageFactories and process plants, where equipment installation and production ramp-up sit on the critical path.
Read the pagePorts, harbours and waterfront civils, planned around tide, weather and scarce marine plant.
Read the pagePublic infrastructure and government programmes that need assurance, stage gates and reporting a non-planner can audit.
Read the pageFAQ
No. This page is about construction as a sector. The other section is about the type of company buying the planning service.
Yes. Shell, core and fit-out can sit in one schedule, with sectional completion between them.
Primavera P6 for the integrated schedule. Short-term plans can live alongside it if the link back to the master is kept.