BLOG

BLOG

Articles on live programmes, data centre schedules, schedule health and the decisions a planner has to put on the table early.

Latest thinking

Posts from the EVM Solutions blog

Planner and project manager comparing recovery and revised programme sheets beside a laptop in a construction site office

Scheduling

Recovery Schedule vs Revised Schedule: Which One You Actually Need

A late finish and a changed scope are not the same problem. A recovery schedule and a revised schedule answer different questions. Using the wrong one hides delay or invents a new baseline you did not approve.

Read post
Commissioning team and planner reviewing a programme inside a hyperscale data centre hall under construction

Data Centres

Hyperscale Data Centres: Why Commissioning Dates Now Drive the Whole Programme

Shell and core no longer set the real finish. On hyperscale jobs, commissioning windows, power and cooling readiness decide the programme. Build the schedule backwards from those dates.

Read post
Two people tracing an unmarked planning network on a workshop wall before construction progress starts

Scheduling

How to Test Schedule Logic Before the First Progress Update

The first progress update will bake the logic into every forecast after it. Test the network before that update, not in the margin of the second report.

Read post
A site supervisor looking at an unfinished concrete frame, with stacked steel and timber and an idle crane

Critical Path

Construction Inflation, Labour Gaps and What That Does to Your Critical Path in 2026

Higher prices and missing crews do not sit in a cost report alone. In 2026 they change how long work takes, and that moves the critical path.

Read post
Planner, cost engineer and reporting lead reviewing one programme and cost file together in a project office

Scheduling

Why EVM Solutions Combines Planning, Controls and Reporting in One Team

When planning, cost and reporting sit in separate seats, the project gets three versions of the truth. One team owning the same data date is how that stops.

Read post
A single-page Monday project report on a desk beside a laptop, with a clean milestone and risk summary

Reporting

Clarity Beats Noise: What Leadership Should See Every Monday

Directors do not need another dashboard. They need one Monday page that shows what moved, what is critical, and what decision cannot wait another week.

Read post
Project director reviewing a simple earned value chart showing SPI and CPI beside a printed programme

Scheduling

SPI and CPI in Plain English for Project Directors

SPI and CPI are simple once EV, PV and AC are clear. Here is what they say to a project director, what they hide, and how to ask for them every week.

Read post
Construction team reviewing a 4D planning model of a UK site sequence on a large screen in a site office

Scheduling

4D Planning Is Growing on UK Sites — When the Model Helps and When It Does Not

More UK sites are using 4D. The model helps when it tests sequence and logistics against a real programme. It fails when it is only a film of a weak schedule.

Read post
Developer and planner reviewing milestone dates on a baseline programme before freezing the schedule

Baseline

Book a Baseline Review Before You Freeze Developer Milestone Dates

Developer milestone dates harden into sales and contract pressure. Freeze them only after a baseline review has tested the network that is supposed to hit them.

Read post
Site engineer and planner agreeing percent complete and remaining duration against a written progress rule

Scheduling

Measure Progress the Same Way, Every Week, or EVM Will Lie

Earned value only tells the truth when progress is measured the same way every data date. Change the rule mid-job and SPI and CPI will lie with confidence.

Read post
Planner and site manager reviewing a programme in a site office overlooking a live construction frame

Scheduling

What Project Controls Actually Protects on a Live Programme

A live programme is already moving. Project controls does not freeze it. It protects the decision, the record and the path to the dates that still matter.

Read post
A planner walking the aisle of a data centre hall between switchgear and cooling plant during construction

Scheduling

Why Fast-Track Data Centre Programmes Fail Without a Single Schedule Owner

A data centre can look busy and still miss the megawatt date. The usual cause is not effort. It is more than one person owning the schedule.

Read post
Planner reviewing a printed schedule network and a laptop before a project report cycle

Scheduling

Request a Schedule Health Review Before Your Next Report Cycle

The next report will repeat whatever is wrong in the file. A health review before that cycle is how you find the broken logic while it can still be fixed.

Read post
A planner speaking to a project team at the start of a meeting, with the site visible through the window

Scheduling

The Planner Who Tells the Truth Early Saves the Project

The useful planner is not the one who protects the meeting from bad news. It is the one who puts the bad news on the table while there is still a choice.

Read post
Schedule health check audit showing Primavera P6 Gantt chart analysis and logic verification

Reporting

Request a Schedule Health Review Before Your Next Report Cycle

As monthly reporting approaches, ensure your underlying schedule is healthy. Discover how an independent schedule review by EVM Solutions validates logic, constraints, and critical path validity before data finalization.

Read post
Project controls for live programme scheduling, cost management and performance reporting

Insights

What Project Controls Actually Protects on a Live Programme

Project controls do more than monitor deadlines and budgets. They protect the decisions, resources and delivery commitments that keep a live programme moving forward. Discover how effective planning, scheduling, risk management and reporting help teams identify problems early and maintain control.

Read post
Project planner analyzing Primavera P6 schedule metrics and presenting honest delay analysis to leadership

Project Controls

The Planner Who Tells the Truth Early Saves the Project

Optimistic schedule reporting delays hard decisions until it is too late. Learn why empowering planners to flag logic breaches and critical path delays early protects project viability and cost control.

Read post
Data centre construction site showing infrastructure complexity and project scheduling oversight

Project Controls

Why Fast-Track Data Centre Programmes Fail Without a Single Schedule Owner

Fast-track data centre builds face severe risks when scheduling is fragmented across multiple trade contractors. Discover why centralizing schedule control under a single owner protects critical path milestones and commissioning dates.

Read post
MS Project vs. Primavera P6: Which Is More Accurate for Schedule Updates?

Tools

MS Project vs. Primavera P6: Which Is More Accurate for Schedule Updates?

When updating complex project schedules, accuracy depends on logic, progress data, constraints and settings — not the software brand.

Read post
Different Types of Planning Reports

Reporting

Different Types of Planning Reports

Progress, status, forecast, variance, trend and earned value reports each tell a different part of the project story.

Read post
10 Myths Surrounding Project Schedule Updates

Scheduling

10 Myths Surrounding Project Schedule Updates

A schedule update is more than moving the data date. These ten myths are among the most frequent errors made when programmes are updated.

Read post
Preparing a Baseline in Primavera P6: A Checklist

Baseline

Preparing a Baseline in Primavera P6: A Checklist

An approved baseline in Primavera P6 is the standard against which progress and change are measured. Review these checks before assigning it.

Read post
Tender Schedule vs. Baseline, Recovery and Revised Schedule

Scheduling

Tender Schedule vs. Baseline, Recovery and Revised Schedule

A project may have several schedules as it moves from bidding to delivery. Here is how tender, baseline, recovery and revised programmes differ.

Read post

NEXT STEP

READY TO TAKE CONTROL OF YOUR PROJECT?

If your project needs stronger planning, more reliable schedule information, or better visibility of performance, EVM Solutions can provide the specialist support required.

REQUEST A CONSULTATION

Share a little about your project. We will respond with the most relevant specialist.