Long-lead plant
Switchgear and cooling equipment often set the date. Factory slots and delivery need activities of their own.
DATA CENTRES
A data centre is late when the power and cooling path is late, even if the building looks finished. The schedule has to follow that path.
Data centres
Data-centre programmes promise a megawatt date. That date depends on transformers, switchgear, generators, cooling plant, controls and a commissioning sequence that cannot be crashed by adding labour at the end.
We schedule design freeze, procurement slots, deliveries, installation by hall or data room, and the test stages that lead to energisation. Level 1 to integrated systems testing is logic, not a single bar called commissioning.
Phased delivery is normal. Later halls should not inherit float that the first energisation has already consumed. Coding by hall, system and contractor keeps that visible.
On the programme
Switchgear and cooling equipment often set the date. Factory slots and delivery need activities of their own.
Component, system and integrated tests have predecessors. Skipping the logic is how teams discover a late hall in the last month.
Each hall or data suite needs a path to energisation that can be reported on its own.
How we help
Planning, scheduling and project controls from a Manchester-based consultancy, deployed to the programme rather than tied to a local office in every city.
A baseline aimed at the power-on date, with building works in their real place on the path.
Manufacturer dates linked to installation so a slipped factory slot is seen early.
Hall-by-hall progress for owners who are tracking more than one site.
Also in this section
Buildings and campuses, where trade sequence, access and sectional completion decide the finish date.
Read the pageRail, road, water and utilities, where possessions, third parties and linear access drive the dates.
Read the pagePower, renewables, networks and utilities, planned around outages, commissioning and regulatory dates.
Read the pageBrownfield shutdowns, long-lead equipment and commissioning on programmes where the asset stays live.
Read the pageFactories and process plants, where equipment installation and production ramp-up sit on the critical path.
Read the pagePorts, harbours and waterfront civils, planned around tide, weather and scarce marine plant.
Read the pagePublic infrastructure and government programmes that need assurance, stage gates and reporting a non-planner can audit.
Read the pageFAQ
Yes. Shell, MEP and commissioning sit in one schedule so the energisation date has a traceable path.
Yes. We map the WBS to the owner stages and the contractor packages.
We support data-centre programmes in the UK, the USA, the UAE and other regions. The location pages describe the local market. This page describes the sector.