ENERGY AND UTILITIES

Planning and Scheduling for Energy and Utilities

Energy projects finish when the asset is safe to energise or take over, not when the civil works look complete.

Energy and utilities

Outages and commissioning decide the date

Generation, grid, renewables and utility programmes share a planning problem: the work meets a live network. Outages are booked, not invented, and commissioning has a sequence the plant vendor will not shortcut.

We schedule development milestones, consents, procurement, construction, outage windows and takeover tests as one programme. Where several sites roll up to a portfolio, the coding lets a sponsor see each asset without merging files by hand.

Regulatory and connection dates are treated as constraints with owners. If the connection offer moves, the rest of the logic shows what that does to construction.

On the programme

What has to be got right

Connection and outages

Grid connection and planned outages are external dates. The schedule shows what must be true before each one.

Commissioning logic

Mechanical completion, pre-commissioning and performance tests are separate. One bar called "startup" is not a plan.

Portfolio roll-up

Sponsors with several assets need the same data date and the same definition of progress.

How we help

How EVM Solutions supports the team

Planning, scheduling and project controls from a Manchester-based consultancy, deployed to the programme rather than tied to a local office in every city.

Outage-based schedules

Construction and commissioning sequenced around the windows the network owner will actually grant.

Vendor alignment

OEM dates for turbines, transformers and controls tied into the site programme.

Sponsor reporting

A consistent picture across assets, suitable for investment committees.

FAQ

Questions we are often asked

Does this include renewable projects?

Yes. Solar, onshore wind, storage and grid connections are planned with the same discipline, with their own commissioning paths.

How do you treat a connection date that is not yet firm?

We show it as a constraint, record the assumption, and test what moves if the date changes.

Is oil and gas included here?

Oil and gas has its own page, because shutdowns, brownfield tie-ins and the contract models are different.