Access as a predecessor
The specialist does not start because a bar says so. The schedule shows the access activity it depends on.
SPECIALIST SUBCONTRACTORS
Specialist subcontractors lose money when the master schedule moves and their own plan does not. They need a programme that shows their constraints clearly.
Specialist subcontractors
A façade, structure, interiors or building-services specialist is usually given dates by a main contractor. Those dates are not always logic. Materials, design approval, access and preceding trades decide whether the specialist can start. If that chain is only in a mailbox, the specialist cannot show why it was late.
We build a subcontractor schedule that ties procurement and labour to the access the main contractor has actually promised. It is detailed where the specialist carries risk, and it names the interface milestones the main contract must hit. When access slips, the effect on the specialist finish is visible immediately.
The product is small enough for a project manager to update weekly, and solid enough to attach to a notice.
On the programme
The specialist does not start because a bar says so. The schedule shows the access activity it depends on.
Shop drawings, approval and manufacture are on the path when they can delay installation.
Date movement is recorded against the interface, which is what a commercial letter needs.
How we help
Planning, scheduling and project controls from a Manchester-based consultancy, deployed to the programme rather than tied to a local office in every city.
A programme the specialist can submit, aligned to the main contract milestones it has accepted.
A short plan focused on what is blocking the next activities.
A clear fragnet when main-contractor access or information is late.
Also in this section
Integrated baselines, package interfaces and look-aheads a main contractor can submit and maintain.
Read the pageStage gates from land and design through construction, for developers who need a date they can fund.
Read the pageLinear works, possessions and utility interfaces for civil engineering contractors.
Read the pageDesign release, long-lead plant, area installation and commissioning for MEP contractors.
Read the pageSectional access, tenant changes and handover inspections for fit-out contractors.
Read the pageFAQ
No. Any specialist with procurement, design approval or access risk can use the same model. MEP and fit-out also have their own pages because their commissioning and handover issues differ.
We prepare the schedule evidence. The commercial team sends the notice. We do not replace your contract administrator.
Yes, if the interface milestones match. We prefer one system where the specialist is expected to submit in the main contractor tool.