Import as critical path
Shipping and receiving gates sit in front of installation, with real durations.
ICELAND
Icelandic programmes are logistics programmes first. Weather, import capacity and scarce specialist plant decide the finish more often than crew size.
Iceland
Almost everything heavy arrives by sea or air under constraints a mainland schedule ignores. Weather can close outdoor work and transport at the same time. Those facts belong in the baseline.
We schedule energy, industrial, infrastructure-adjacent and building programmes with import, customs, laydown and weather as named activities. Specialist plant mobilisation is a resource and a predecessor, not an assumption in a duration.
The product is a maintainable file: detailed where Iceland carries risk, lean enough for a small project team to update every period.
On the programme
Shipping and receiving gates sit in front of installation, with real durations.
Calendars on outdoor and transport activities match the site, not a generic Nordics average.
Cranes and specialist equipment are scheduled as shared resources when they gate multiple packages.
A short, comparable monthly or bi-weekly rhythm a small team can keep.
How we help
Planning, scheduling and project controls from a Manchester-based consultancy, deployed to the programme rather than tied to a local office in every city.
Logistics-first networks for energy, industrial and construction work.
Vendor and shipping dates tied to site activities.
Re-sequencing after a closed window without inventing a new story.
PMaaS-style capacity when the team cannot staff a full-time planner.
Also in this section
Commercial, infrastructure and industrial programmes planned around Swedish winter calendars and city logistics.
Read the pageEnergy, infrastructure and construction planned around Norwegian weather windows and logistics.
Read the pageInfrastructure, buildings and energy planned around dense Danish interfaces and import logistics.
Read the pageIndustrial, energy and construction planned around deep Finnish winters and long-lead plant.
Read the pageKeep reading
Wider regional planning support across Europe and beyond.
Open pageCross-border European calendars and reporting.
Open pageHow planning changes for construction, energy, infrastructure and other sectors.
Open pageBaselines, updates and recovery programmes.
Open pageIntegrated controls, reporting and decision packs.
Open pageFAQ
The method is the same. The logistics and weather assumptions are heavier and must be explicit.
Yes. Use the Energy & Utilities industry page for sector logic and this page for Icelandic constraints.
No. We often provide the planning capacity the project cannot hire permanently for the peak.