Contract-aligned programme
NEC accepted programmes and JCT programmes structured so submissions and updates match the contract.
UNITED KINGDOM
Project controls for United Kingdom programmes: planning, scheduling, earned value, change and reporting on one data date. Based in Manchester, EVM Solutions supports UK project teams with controls that survive the board room and the commercial meeting.
Project controls UK
Project controls in the UK is not a dashboard hobby. Under NEC and JCT, the accepted programme, early warnings, compensation events and monthly reporting are part of how the job is run. If schedule, progress and cost close on different weeks, the public or board date becomes an argument instead of a fact.
EVM Solutions Ltd is based at Colony, 5 Piccadilly Place, Manchester. From there we provide project controls for programmes in London, the North, the Midlands, Scotland and the South West. The city pages below describe local delivery pressure. The method is national: one network, one data date, frozen progress rules, and a narrative a senior responsible owner can defend.
UK bank holidays, Christmas shutdowns, possessions, design releases and third-party interfaces belong in the schedule as logic. Hiding them as contingency produces float that disappears in the first holiday period or the first blocked access window.
Whether you need an integrated controls setup, a schedule health review, earned value that matches the live programme, recovery after a slip, or monthly packs that people actually use, the UK standard we apply is the same: comparable updates and honest remaining duration.
On the programme
NEC accepted programmes and JCT programmes structured so submissions and updates match the contract.
Bank holidays, industry shutdowns and access rules sit as calendars, not soft contingency.
Earned value and percent complete use the same measure every data date.
Soft constraints and open ends are cleaned so float means something in a board pack.
What moved, why it moved, and what decision is required—written after the file calculates.
Schedule, cost and change close together. Rival spreadsheets are retired, not multiplied.
How we help
Planning, scheduling and project controls from a Manchester-based consultancy, deployed to the programme rather than tied to a local office in every city.
A programme the client can accept, with coding, calendars and a narrative that stands up to review.
Progress, remaining duration, path movement and a pack led by the next decision gate.
SPI and CPI on the same data date as the schedule, with rules that do not change mid-job.
Instructed change kept visible; recovery only where the site can staff the sequence.
Logic, float, constraints and progress integrity checked before the next report or commercial position.
Extra controls capacity for a UK phase without forcing a permanent hire first.
Cities
Open a city for the controls pressures that show up there and how we support the delivery team.
Logistics, interfaces and funder reporting for London programmes that cannot afford a soft finish date.
Read the pageOur home city. Project controls for Manchester and North West programmes from Piccadilly Place.
Read the pageRegeneration, commercial and infrastructure controls across Birmingham and the Midlands.
Read the pageCommercial, healthcare and regeneration controls across Leeds and West Yorkshire.
Read the pageRegeneration, energy transition and commercial controls on Scottish calendars.
Read the pageHarbour regeneration, aerospace supply chain and city-access controls across Bristol and the South West.
Read the pageKeep reading
City planning pages focused on baselines, updates and recovery programmes.
Open pageHow controls change for construction, infrastructure, data centres and government.
Open pageIntegrated controls, reporting and decision packs.
Open pageSPI, CPI and progress rules that match the live network.
Open pageBaselines, updates and recovery programmes.
Open pageFAQ
Practical questions clients ask before they instruct us.
EVM Solutions is based in Manchester, at Colony, 5 Piccadilly Place. We support programmes across the UK from that base and on the project itself.
Planning and Scheduling UK focuses on the programme product and city markets. Project Controls UK covers the wider controls join: schedule, progress measurement, earned value, change and reporting on one data date.
Yes. The schedule, updates and narrative follow the programme obligations in the contract being used.
London, Manchester, Birmingham, Leeds, Glasgow and Bristol. Other UK locations are still covered by this national page.
Most integrated programmes use Primavera P6. We also support Microsoft Project and Power BI where that is the client standard.
Yes. We can lead controls, or sit beside an in-house planner and commercial team to repair the join between schedule, cost and reporting.